Installation of the proper electrical infrastructure to assist in the consolidation of Bank of America’s check and credit card processing.
Coordination of generators, UPS systems, and PDU's for critical service credit operations.
Since 1989, helping to upgrade their medium and low voltage distribution power systems along with the installation of modern lighting to assist in their efforts to improve their efficiency in the production
Project included all maintenance, construction, fiber optics, telecommunications, and computer cabling.
For over 40 years providing new construction, maintenance, renovation, and upgrades for over 200 buildings and facilities. Data centers, lighting, retrofit.
Initial installation and configuration of first toll-tag operation in north Texas. Taken from design to fruition of ever-advancing, card reading technology.
Since 1981 – Electrical support for their data center in an effort to help keep pace with the ever-changing needs of the petroleum/energy sector.
Installation of tiered-structure electrical service, backup, and co-generation for downtown complex, serving both local and national emergency services.
Zero downtime tolerance for 24/7 operation. Since 1968 – helping to keep the HP (formerly EDS) data centers power distribution systems operational 24/7 at the campus in Plano, Texas.