The Allen AIC project was quite an undertaking. Hargrove was responsible for the complete retrofit of their existing 2nd-floor electrical system to create more redundancy to their system with a true A/B system. The installation of a 900 KVA system with battery backup, maintenance by-pass panels, and 500’ 600 amp buss duct. The Allen AIC project was successfully completed and on time while the facility was online with no loss of power to their critical loads.