Call Us Today!

TCU

Client:

TCU

Project Details:

Type:
  • Electrical Services
  • BIM
  • CAD
  • Engineering
  • Prefabrication
  • Backup/ Standby Power

Project Summary:

HEC completed the east side addition at TCU’s Amon G. Carter football stadium.  This addition added roughly 2,000 luxury seats to the existing stadium.  This work was completed all while keeping the stadium operational throughout TCU’s 2019-2020 football season. 

HEC has completed several projects at the campus and continues to work with and support the electrical needs at TCU. 

Side note: the owner of HEC is an alumnus of TCU!